People & practices / Score 50 · Listed
Hammer & Hand
A builder for complicated houses, often beside an architect, with a public focus on craft and building science.
How the firm describes itself.
Hammer & Hand’s homepage says it has spent 30 years building in the Pacific Northwest, as a home builder and general contractor in Portland, Seattle, and nearby. The FAQ says the doors opened in 1995. The about page says the firm is a company of carpenters and a traditional builder: architect, builder, and client, not an in-house design studio. It also says the company is becoming employee-owned. That sentence is written as a change underway, not as a finished fact. The homepage lists residential, commercial, and high-performance work, plus an in-house woodshop.
Work to look at
The Historic Portland Remodel is a 1920s house. A small opening between kitchen and dining room became a whole-house project after the southeast corner was found to have settled three inches. The builder’s account describes lifting the house, replacing a load-bearing beam, and moving a stair. Designers Maria Cohen and Benjamin Silver are credited. A second example, the Retro Kitchen, is a 1913 Craftsman in Ladd’s Addition, with design credited to Kevin Fischer and Charlotte Cooney.
What clients report
Checked 2026-10-02. The public review set is small for a firm of this reputation. Houzz listed 4.8 from 17 reviews; the review text on that page did not load in this check. A compilation of 21 reviews sat at 4.9, with about 13 percent at two stars and none at one star in that snapshot. Another compilation of 13 reviews includes a June 2023 note that says only “Unreliable,” with no project detail. A one-word review is not a finding. It is also not something to skip.
Longer comments on those compilations describe old-house work. Steve Cook wrote in 2025 about a 2010–2012 remodel of a 1913 house: kitchen, basement, and upstairs. David Cohen, in 2022, wrote that his household interviewed six contractors for a century-old house and hired Hammer & Hand.
License and score
- Legal name: HAMMER AND HAND INC
- CCB 105118 · Residential General Contractor
- Responsible managing individual: Daniel Branden Thomas
- First registered 1995-03-16 · expires 2027-04-03
- Bond $25,000 · liability insurance $1,000,000
- CCB record city: Portland
- On Portland FIR list (PDF updated 2026-03-06): yes
- Score: 50 / 100 · Tier: Listed
- Checked 2026-10-02. Gate passed: active Oregon CCB.
Score factors
| Factor | Available | Awarded | Source | Evidence | Date checked |
|---|---|---|---|---|---|
| FIR participant | 10 | 10 | Portland FIR roster | Roster updated 2026-03-06 lists HAMMER AND HAND, INC., CCB 105118. | 2026-10-02 |
| Relevant portfolio | 10 | Not itemized | Locked score sheet | The October 2 score sheet locks the total and does not split this factor. Not inferred. | 2026-10-02 |
| Recent design award | 10 | Not itemized | Locked score sheet | The October 2 score sheet locks the total and does not split this factor. Not inferred. | 2026-10-02 |
| Architect-named property | 15 | 0 | Locked score sheet | No firm in this set scored architect-named property. Not invented. | 2026-10-02 |
| Fixed price, zero allowances | 15 | 0 | Locked score sheet | No firm in this set scored fixed price with zero allowances. Not invented. | 2026-10-02 |
| On-site supervision | 10 | Not itemized | Locked score sheet | The October 2 score sheet locks the total and does not split this factor. Not inferred. | 2026-10-02 |
| Schedule history | 10 | Not itemized | Locked score sheet | The October 2 score sheet locks the total and does not split this factor. Not inferred. | 2026-10-02 |
| License age | 10 | 10 | CCB active licenses | Residential General Contractor issued 1995-03-16, more than 10 years before 2026-10-02. No extra points after 10 years. | 2026-10-02 |
| NARI member | 5 | Not itemized | Locked score sheet | The October 2 score sheet locks the total and does not split this factor. Not inferred. | 2026-10-02 |
| NKBA member | 5 | Not itemized | Locked score sheet | The October 2 score sheet locks the total and does not split this factor. Not inferred. | 2026-10-02 |
Itemized points add to 20. The locked total is 50. The difference is not split across the remaining factors, because the score sheet says not to infer points.
Firm website · Look up CCB 105118 · FIR list PDF · Directory entry