Permit guide
Portland’s FIR program, explained
FIR is a City of Portland permitting track for Oregon-licensed contractors and architects who do recurring work on one- and two-family houses. It is not a quality award. It is a faster path to certain residential permits, and as of March 2026 it is closed to new firms.
Key facts
- Official name: Field Issuance Remodel Program, Portland Permitting & Development.
- Waitlist to join: closed as of March 2026.
- ADUs cannot be permitted through FIR. Neither can SFR-to-duplex conversions or fire-damage repair.
- Homeowners hire a firm already on the city’s FIR contractor list; they do not enroll themselves.
What FIR changes on a job
On a qualifying remodel, the FIR contractor works with an assigned city inspector instead of the standard residential plan-review queue. Applications go to ppdfirpermits@portlandoregon.gov, not DevHub. A pre-construction meeting is required.
The city still requires plans, trade permits, and inspections. FIR changes the queue and the relationship, not the building code.
What can go through FIR
- Alteration of existing habitable space
- Conversion of existing non-habitable space into habitable space
- New space attached to an existing house
- New detached accessory structures (not ADUs)
- Demolition of a detached accessory structure
- Some work that meets Portland’s Major Residential Alteration or Addition definition
What cannot
- Creation of accessory dwelling units
- Conversion of a house to a duplex
- Demolition of a one- or two-family dwelling
- Fire-damage repair, floating homes, manufactured dwellings, shared garages, standalone solar
Why the closed waitlist matters when you hire
A firm that is not already on the list cannot buy its way in. For a kitchen or addition that qualifies, FIR status is now a scarce operational fact. For an ADU it is irrelevant — you still need a contractor who has pulled ADU permits on the regular path.
City sources: FIR overview · Join FIR · Permit a FIR project · FIR contractor list